42-199-31646

Final Completion

TYRRELL W.C.

HARDIN County · District 3 · RADLEY R. R. · SOUR LAKE

RRC Lookup

Permits

1

Max Depth

1,500 ft

First Permit

1981-09-24

Latest Activity

1981-09-24

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1981-09-30

Shut-In

Plugged

2001-09-19

!

EWA / Permit operator mismatch

Scheduling: RADLEY R. R. ≠ Permit: GARY OIL & GAS

Resolved via: schedulingRADLEY R. R.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2008-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#135292 A GARY OIL & GAS
received 1981-09-24

Well Details

Well Number
3
Max Depth
1,500 ft
Drill Type
Vertical
County
HARDIN
District
3
Operator
RADLEY R. R.
Completed
1981-09-30

Operator

Location
SOURLAKE
P-5 Status
Y (filed 2001-06-08)
Cum Oil (all leases)
62,370 bbl
Cum Gas (all leases)
— mcf
Total Permits
9

External Links

Live © 2026 Petrora