42-199-31735

Final Completion

MCNAMARA J. S. ETAL

HARDIN County · District 3 · RADCO OPERATIONS L.P. · SOUR LAKE

RRC Lookup

Permits

1

Max Depth

2,500 ft

First Permit

1982-04-23

Latest Activity

1982-04-23

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1982-05-25

Shut-In

Plugged

2016-01-19

!

EWA / Permit operator mismatch

Scheduling: RADCO OPERATIONS L.P. ≠ Permit: RADLEY ELECTRIC, INC.

Resolved via: schedulingRADCO OPERATIONS L.P.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2017-05

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#157979 A RADLEY ELECTRIC, INC.
received 1982-04-23

Well Details

Well Number
08
Max Depth
2,500 ft
Drill Type
Vertical
County
HARDIN
District
3
Completed
1982-05-25

Operator

Location
SOURLAKE
P-5 Status
Y (filed 2025-09-04)
Cum Oil (all leases)
1,602,816 bbl
Cum Gas (all leases)
— mcf
Activities
OPRS/O
Total Permits
50

External Links

Live © 2026 Petrora