42-199-31950
Final CompletionCHOATE
HARDIN County · District 3 · ARROWHEAD OPERATING INC. · BATSON NEW
Permits
1
Max Depth
3,600 ft
First Permit
1983-08-12
Latest Activity
1983-08-12
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1985-04-16
Shut-In
—
Plugged
2014-12-16
!
EWA / Permit operator mismatch
Scheduling: ARROWHEAD OPERATING INC. ≠ Permit: CREBBS, CHESTER M.
Resolved via: production → ARROWHEAD OPERATING INC.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-03
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#205238 A CREBBS, CHESTER M.
received 1983-08-04
Well Details
- Well Number
- 11
- Max Depth
- 3,600 ft
- Drill Type
- Vertical
- County
- HARDIN
- District
- 3
- Operator
- ARROWHEAD OPERATING INC.
- Completed
- 1985-04-16
Operator
- Name
- ARROWHEAD OPER INC
- Location
- ARGYLE
- P-5 Status
- Y (filed 2025-09-04)
- Cum Oil (all leases)
- 457,649 bbl
- Cum Gas (all leases)
- 802,972 mcf
- Activities
- GTHS/G, OPRS/G, OPRS/O
- Total Permits
- 57