42-199-32053

Final Completion

CAVIN ETAL LOT 13

HARDIN County · District 3 · ABERDEEN PETROLEUM (USA) INC. · SARATOGA WEST

RRC Lookup

Permits

1

Max Depth

3,500 ft

First Permit

1983-11-01

Latest Activity

1983-11-01

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1983-11-26

Shut-In

Plugged

1990-08-28

!

EWA / Permit operator mismatch

Scheduling: ABERDEEN PETROLEUM (USA) INC. ≠ Permit: G & D ENERGY, INC.

Resolved via: schedulingABERDEEN PETROLEUM (USA) INC.

Operator History

originally filed by G & D ENERGY, INC. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#219420 A G & D ENERGY, INC.
received 1983-11-01

Well Details

Well Number
2
Max Depth
3,500 ft
Drill Type
Vertical
County
HARDIN
District
3
Completed
1983-11-26

Operator

Location
ABILENE
P-5 Status
Y (filed 1993-10-08)
Cum Oil (all leases)
13,135 bbl
Cum Gas (all leases)
— mcf

External Links

Live © 2026 Petrora