42-199-32125

Final Completion

KEITH

HARDIN County · District 3 · SERRA ENERGY INC. · SARATOGA

RRC Lookup

Permits

1

Max Depth

4,000 ft

First Permit

1984-04-19

Latest Activity

1984-04-19

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1984-06-18

Shut-In

Plugged

2000-11-03

!

EWA / Permit operator mismatch

Scheduling: SERRA ENERGY INC. ≠ Permit: FAITH ENERGY COMPANY

Resolved via: schedulingSERRA ENERGY INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2003-08

Operator History

originally filed by FAITH ENERGY COMPANY — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#236187 A FAITH ENERGY COMPANY
received 1984-04-19

Well Details

Well Number
1
Max Depth
4,000 ft
Drill Type
Vertical
County
HARDIN
District
3
Completed
1984-06-18

Operator

Location
HAILEY
P-5 Status
Y (filed 2011-05-06)
Cum Oil (all leases)
457,759 bbl
Cum Gas (all leases)
— mcf
Total Permits
2

External Links

Live © 2026 Petrora