42-199-32158
SHUT INUNICE-BASHARA FEE
HARDIN County · District 3 · RADCO OPERATIONS L.P. · SOUR LAKE
Permits
1
Max Depth
4,000 ft
First Permit
1984-07-19
Latest Activity
1984-07-19
Lifespan
< 1 yr
Regulatory Status
Schedule
ON SCHEDULE
Completion
1984-10-19
Shut-In
—
Plugged
—
P-5 Org Status: X
!
EWA / Permit operator mismatch
Scheduling: RADCO OPERATIONS L.P. ≠ Permit: ATCO PROD. CO., INC.
Resolved via: scheduling → RADCO OPERATIONS L.P.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-03
Operator History
originally filed by ATCO PROD. CO., INC. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#245605 A ATCO PROD. CO., INC.
received 1984-07-18
Well Details
- Well Number
- 2
- Max Depth
- 4,000 ft
- Drill Type
- Vertical
- County
- HARDIN
- District
- 3
- Operator
- RADCO OPERATIONS L.P.
- Completed
- 1984-10-19
Operator
- Location
- SOURLAKE
- P-5 Status
- Y (filed 2025-09-04)
- Cum Oil (all leases)
- 1,602,816 bbl
- Cum Gas (all leases)
- — mcf
- Activities
- OPRS/O
- Total Permits
- 50