42-199-32280

PRODUCING

CARPENTER PRODUCTION CO.

HARDIN County · District 3 · RADCO OPERATIONS L.P. · SOUR LAKE

RRC Lookup

Permits

1

Max Depth

5,400 ft

First Permit

1985-05-09

Latest Activity

1985-05-09

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

1985-07-05

Shut-In

Plugged

P-5 Org Status: X

!

EWA / Permit operator mismatch

Scheduling: RADCO OPERATIONS L.P. ≠ Permit: E-TEX OIL CO.

Resolved via: productionRADCO OPERATIONS, L.P.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#274524 A E-TEX OIL CO.
received 1985-05-09

Well Details

Well Number
18
Max Depth
5,400 ft
Drill Type
Vertical
County
HARDIN
District
3
Completed
1985-07-05

Operator

Location
SOURLAKE
P-5 Status
Y (filed 2025-09-04)
Cum Oil (all leases)
1,602,816 bbl
Cum Gas (all leases)
— mcf
Activities
OPRS/O
Total Permits
50

External Links

Live © 2026 Petrora