42-199-32823

Final Completion

LONE ACRE

HARDIN County · District 3 · RADCO OPERATIONS L.P. · SOUR LAKE

RRC Lookup

Permits

1

Max Depth

1,100 ft

First Permit

2000-12-29

Latest Activity

2000-12-29

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2002-02-23

Shut-In

Plugged

2012-11-20

!

EWA / Permit operator mismatch

Scheduling: RADCO OPERATIONS L.P. ≠ Permit: RADCO OPERATIONS

Resolved via: productionRADCO OPERATIONS, L.P.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2002-02

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#503499 A RADCO OPERATIONS
received 2000-12-28

Well Details

Well Number
1
Max Depth
1,100 ft
Drill Type
Vertical
County
HARDIN
District
3
Completed
2002-02-23

Operator

Location
SOURLAKE
P-5 Status
Y (filed 2025-09-04)
Cum Oil (all leases)
1,602,816 bbl
Cum Gas (all leases)
— mcf
Activities
OPRS/O
Total Permits
50

External Links

Live © 2026 Petrora