42-199-33216

Final Completion

BP RICKER

HARDIN County · District 3 · BRAMMER ENGINEERING INC. · MAPLE SLOUGH (UPPER WILCOX CONS)

RRC Lookup

Permits

5

Max Depth

13,700 ft

First Permit

2009-06-26

Latest Activity

2010-08-11

Lifespan

1 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2010-08-28

Shut-In

Plugged

2011-05-16

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2009-10

Last Production

2011-05

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (5)

#700468 A BRAMMER ENGINEERING, INC.
received 2010-08-10
#682509 A BRAMMER ENGINEERING, INC.
received 2010-05-05
#682509 A BRAMMER ENGINEERING, INC.
received 2009-09-30
#682509 A BRAMMER ENGINEERING, INC.
received 2009-07-01
#682509 A BRAMMER ENGINEERING, INC.
received 2009-06-25

Well Details

Well Number
1
Max Depth
13,700 ft
Drill Type
Vertical
County
HARDIN
District
3
Completed
2010-08-28

Operator

Location
SHREVEPORT
P-5 Status
Y (filed 2025-11-04)
Cum Oil (all leases)
280,169 bbl
Cum Gas (all leases)
65,254,713 mcf
Activities
G/PUR, OPRS/G, OPRS/O
Total Permits
194

External Links

Live © 2026 Petrora