42-199-33216
Final CompletionBP RICKER
HARDIN County · District 3 · BRAMMER ENGINEERING INC. · MAPLE SLOUGH (UPPER WILCOX CONS)
Permits
5
Max Depth
13,700 ft
First Permit
2009-06-26
Latest Activity
2010-08-11
Lifespan
1 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
2010-08-28
Shut-In
—
Plugged
2011-05-16
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
2009-10
Last Production
2011-05
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (5)
#700468 Recompletion Final Completion
BP RICKER · 13,200 ft
2010-08-11
Spud 2010-08-17
#682509 Drill Final Completion
BP RICKER · 13,700 ft
2009-06-26
Spud 2009-08-18
#682509 Drill Unperfed Completion
BP RICKER · 13,700 ft
2009-06-26
Spud 2009-08-18
#682509 Drill
BP RICKER · 12,500 ft
2009-06-26
Spud 2009-08-18
#682509 Drill
BP RICKER · 13,200 ft
2009-06-26
Permit Applications (5)
#700468 A BRAMMER ENGINEERING, INC.
received 2010-08-10
#682509 A BRAMMER ENGINEERING, INC.
received 2010-05-05
#682509 A BRAMMER ENGINEERING, INC.
received 2009-09-30
#682509 A BRAMMER ENGINEERING, INC.
received 2009-07-01
#682509 A BRAMMER ENGINEERING, INC.
received 2009-06-25
Well Details
- Well Number
- 1
- Max Depth
- 13,700 ft
- Drill Type
- Vertical
- County
- HARDIN
- District
- 3
- Operator
- BRAMMER ENGINEERING INC.
- Completed
- 2010-08-28
Operator
- Location
- SHREVEPORT
- P-5 Status
- Y (filed 2025-11-04)
- Cum Oil (all leases)
- 280,169 bbl
- Cum Gas (all leases)
- 65,254,713 mcf
- Activities
- G/PUR, OPRS/G, OPRS/O
- Total Permits
- 194