MURPHY ENERGY SERVICES SWD
HARDIN County · District 3 · GHOST ROAD LLC · SARATOGA WEST
Permits
1
Max Depth
4,500 ft
First Permit
2011-07-26
Latest Activity
2011-07-26
Lifespan
< 1 yr
Regulatory Status
Schedule
ON SCHEDULE
Completion
2012-09-21
Shut-In
—
Plugged
—
P-5 Org Status: Active
!
EWA / Permit operator mismatch
Scheduling: GHOST ROAD LLC ≠ Permit: MURPHY ENERGY SERVICES, LP
Resolved via: scheduling → GHOST ROAD LLC
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
2012-09
Last Production
2026-03
Operator History
originally filed by MURPHY ENERGY SERVICES, LP — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#720401 A MURPHY ENERGY SERVICES, LP
received 2011-07-15
Well Details
- Well Number
- 1
- Max Depth
- 4,500 ft
- Drill Type
- Vertical
- County
- HARDIN
- District
- 3
- Operator
- GHOST ROAD LLC
- Completed
- 2012-09-21
Operator
- Name
- GHOST ROAD, LLC
- Location
- BATSON
- P-5 Status
- Y (filed 2025-09-04)
- Cum Oil (all leases)
- 11,134 bbl
- Cum Gas (all leases)
- — mcf
- Activities
- OPRS/O