42-199-33367

PRODUCING

TARVER - HARDIN

HARDIN County · District 3 · RADCO OPERATIONS L.P. · SOUR LAKE

RRC Lookup

Permits

1

Max Depth

2,200 ft

First Permit

2012-04-16

Latest Activity

2012-04-16

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

2013-02-01

Shut-In

Plugged

P-5 Org Status: X

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#736409 A RADCO OPERATIONS, L.P.
received 2012-03-20

Well Details

Well Number
88
Max Depth
2,200 ft
Drill Type
Vertical
County
HARDIN
District
3
Completed
2013-02-01

Operator

Location
SOURLAKE
P-5 Status
Y (filed 2025-09-04)
Cum Oil (all leases)
1,602,816 bbl
Cum Gas (all leases)
— mcf
Activities
OPRS/O
Total Permits
50

External Links

Live © 2026 Petrora