42-199-33615

PRODUCING

TARVER - HARDIN

HARDIN County · District 3 · RADCO OPERATIONS L.P. · SOUR LAKE

RRC Lookup

Permits

1

Max Depth

2,400 ft

First Permit

2018-12-13

Latest Activity

2018-12-13

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

2019-02-06

Shut-In

Plugged

P-5 Org Status: X

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#847314 A RADCO OPERATIONS, L.P.
received 2018-11-30
Lat 30.159536
Lon -94.424462

Well Details

Well Number
96
Max Depth
2,400 ft
Drill Type
Vertical
County
HARDIN
District
3
Completed
2019-02-06

Operator

Location
SOURLAKE
P-5 Status
Y (filed 2025-09-04)
Cum Oil (all leases)
1,602,816 bbl
Cum Gas (all leases)
— mcf
Activities
OPRS/O
Total Permits
50

External Links

Live © 2026 Petrora