42-201-31344

Final Completion

TAYLOR E. R.

HARRIS County · District 3 · PRIMAL ENERGY CORPORATION · PIERCE JUNCTION

RRC Lookup

Permits

1

Max Depth

10,000 ft

First Permit

1981-12-29

Latest Activity

1981-12-29

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2005-10-24

Shut-In

Plugged

2009-01-27

!

EWA / Permit operator mismatch

Scheduling: PRIMAL ENERGY CORPORATION ≠ Permit: AMERICAN CRUDE, INC.

Resolved via: schedulingPRIMAL ENERGY CORPORATION

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2018-12

Operator History

originally filed by AMERICAN CRUDE, INC. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#145484 A AMERICAN CRUDE, INC.
received 1981-12-29

Well Details

Well Number
1
Max Depth
10,000 ft
Drill Type
Vertical
County
HARRIS
District
3
Completed
2005-10-24

Operator

Location
THE WOODLAN, DS
P-5 Status
Y (filed 2026-02-04)
Cum Oil (all leases)
748,625 bbl
Cum Gas (all leases)
14,492,022 mcf
Activities
OPRS/G, OPRS/O
Total Permits
59

External Links

Live © 2026 Petrora