42-201-31535

Final Completion

KATY GAS UNIT

HARRIS County · District 3 · DOUGLAS PETROLEUM INC. · KATY (FIRST WILCOX)

RRC Lookup

Permits

1

Max Depth

10,737 ft

First Permit

1983-02-28

Latest Activity

1983-02-28

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1983-06-14

Shut-In

Plugged

2000-07-25

!

EWA / Production operator mismatch

Scheduling: DOUGLAS PETROLEUM INC. ≠ Production: DIAMOND TRADING & PIPELINE CORP (reported 1998-09)

!

EWA / Permit operator mismatch

Scheduling: DOUGLAS PETROLEUM INC. ≠ Permit: TEMPLETON ENERGY, INC

Resolved via: schedulingDOUGLAS PETROLEUM INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2000-07

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#187177 A TEMPLETON ENERGY, INC
received 1983-02-28

Well Details

Well Number
1
Max Depth
10,737 ft
Drill Type
Vertical
County
HARRIS
District
3
Completed
1983-06-14

Operator

Location
SPRING
P-5 Status
Y (filed 2010-06-05)
Cum Oil (all leases)
16,240 bbl
Cum Gas (all leases)
253,432 mcf

External Links

Live © 2026 Petrora