42-203-30482

Final Completion

GEORGE GAS UNIT

HARRISON County · District 6 · HURLEY PETROLEUM CORPORATION · WASKOM (TRAVIS PEAK LOWER)

RRC Lookup

Permits

3

Max Depth

9,632 ft

First Permit

1977-12-05

Latest Activity

1988-10-10

Lifespan

11 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1979-07-20

Shut-In

Plugged

2008-11-25

!

EWA / Production operator mismatch

Scheduling: HURLEY PETROLEUM CORPORATION ≠ Production: WINCHESTER PRODUCTION COMPANY (reported 2005-08)

!

EWA / Permit operator mismatch

Scheduling: HURLEY PETROLEUM CORPORATION ≠ Permit: WINCHESTER PRODUCTION COMPANY

Resolved via: schedulingHURLEY PETROLEUM CORPORATION

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2008-11

Operator History

originally filed by WINCHESTER PRODUCTION COMPANY — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (3)

#351974 A WINCHESTER PRODUCTION COMPANY
received 1988-10-06
#233718 A HURLEY PETROLEUM CORPORATION
received 1984-01-18
#550 A HURLEY PETROLEUM CORPORATION
received 1977-12-05

Well Details

Well Number
1
Max Depth
9,632 ft
Drill Type
Vertical
County
HARRISON
District
6
Completed
1979-07-20

Operator

Location
BATON ROUGE
P-5 Status
Y (filed 1998-03-06)
Cum Oil (all leases)
12,434 bbl
Cum Gas (all leases)
1,808,559 mcf
Total Permits
30

External Links

Live © 2026 Petrora