42-203-30498

Long String Casing

ABNEY GAS UNIT #2

HARRISON County · District 6 · DEVON ENERGY PRODUCTION CO L.P. · WASKOM (COTTON VALLEY)

RRC Lookup

Permits

1

Max Depth

9,700 ft

First Permit

1977-08-30

Latest Activity

1977-08-30

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1994-04-17

Shut-In

Plugged

2008-11-11

!

EWA / Production operator mismatch

Scheduling: DEVON ENERGY PRODUCTION CO L.P. ≠ Production: BRAMMER-KEYSTONE ENERGY, L.L.C. (reported 1999-11)

!

EWA / Permit operator mismatch

Scheduling: DEVON ENERGY PRODUCTION CO L.P. ≠ Permit: MOBIL OIL CORPORATION

Resolved via: schedulingDEVON ENERGY PRODUCTION CO L.P.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2008-11

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#6533 A MOBIL OIL CORPORATION
received 1977-08-30

Well Details

Well Number
10
Max Depth
9,700 ft
Drill Type
Vertical
County
HARRISON
District
6
Completed
1994-04-17

Operator

Location
OKLAHOMA CI, TY
P-5 Status
Y (filed 2025-11-04)
Cum Oil (all leases)
360,504,673 bbl
Cum Gas (all leases)
9,266,199,431 mcf
Activities
CSGD/G, CSGD/P, G/PUR, GTHS/C, GTHS/G, GTHS/O, OPRS/G, OPRS/O
Total Permits
9,223

External Links

Live © 2026 Petrora