42-203-30659
Final CompletionABNEY A
HARRISON County · District 6 · SMITH PIPE OF ABILENE · WASKOM (COTTON VALLEY)
Permits
1
Max Depth
10,700 ft
First Permit
1979-06-18
Latest Activity
1979-06-18
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1979-09-25
Shut-In
—
Plugged
1989-06-02
!
EWA / Permit operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Permit: TEXAS OIL & GAS CORP.
Resolved via: scheduling → SMITH PIPE OF ABILENE
Operator History
originally filed by TEXAS OIL & GAS CORP. — asset transferred
Permit Applications (1)
#50907 A TEXAS OIL & GAS CORP.
received 1979-06-18
Well Details
- Well Number
- 1
- Max Depth
- 10,700 ft
- Drill Type
- Vertical
- County
- HARRISON
- District
- 6
- Operator
- SMITH PIPE OF ABILENE
- Completed
- 1979-09-25
Operator
- Location
- ABILENE
- P-5 Status
- Y (filed 2024-07-03)
- Cum Oil (all leases)
- 17,644 bbl
- Cum Gas (all leases)
- 14,486 mcf