42-203-30703

TEMP ABANDONED

PEAL A.H.

HARRISON County · District 6 · FAULCONER ENERGY LLC · WHELAN (TRAVIS PEAK PRORATED)

RRC Lookup

Permits

2

Max Depth

9,200 ft

First Permit

1980-01-11

Latest Activity

1980-01-11

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

1998-10-16

Shut-In

Plugged

P-5 Org Status: Active

!

EWA / Production operator mismatch

Scheduling: FAULCONER ENERGY LLC ≠ Production: XTO ENERGY INC. (reported 2009-01)

!

EWA / Permit operator mismatch

Scheduling: FAULCONER ENERGY LLC ≠ Permit: CROSS TIMBERS OPERATING COMPANY

Resolved via: schedulingFAULCONER ENERGY LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#70385 A CROSS TIMBERS OPERATING COMPANY
received 1998-07-21
#70385 A ENSERCH EXPLORATION, INC
received 1980-01-11

Well Details

Well Number
2
Max Depth
9,200 ft
Drill Type
Vertical
County
HARRISON
District
6
Completed
1998-10-16

Operator

Location
TYLER
P-5 Status
Y (filed 2025-09-04)
Cum Oil (all leases)
344,817 bbl
Cum Gas (all leases)
64,700,023 mcf
Activities
CSGD/G, CSGD/P, G/PUR, GTHS/G, OPRS/G, OPRS/O
Total Permits
37

External Links

Live © 2026 Petrora