42-203-30713
Final CompletionRAVENS E.
HARRISON County · District 6 · PHILLIPS JACK L. · BETHANY (TRAVIS PEAK 6300 GAS)
Permits
2
Max Depth
6,600 ft
First Permit
1979-12-31
Latest Activity
1993-10-01
Lifespan
14 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1980-10-10
Shut-In
—
Plugged
2000-03-31
!
EWA / Production operator mismatch
Scheduling: PHILLIPS JACK L. ≠ Production: PHILLIPS, JACK L. CO. (reported 2019-05)
Resolved via: scheduling → PHILLIPS JACK L.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-03
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (2)
Permit Applications (2)
#416451 A PHILLIPS, JACK L.
received 1993-09-27
#68205 A PHILLIPS, JACK L.
received 1979-12-31
Well Details
- Well Number
- 1
- Max Depth
- 6,600 ft
- Drill Type
- Vertical
- County
- HARRISON
- District
- 6
- Operator
- PHILLIPS JACK L.
- Completed
- 1980-10-10
Operator
- Name
- PHILLIPS, JACK L
- Location
- GLADEWATER
- P-5 Status
- Y (filed 1998-06-05)
- Cum Oil (all leases)
- 340,377 bbl
- Cum Gas (all leases)
- 2,727,338 mcf
- Total Permits
- 50