42-203-31010
Final CompletionRAVENS E.
HARRISON County · District 6 · PHILLIPS JACK L. CO. · BETHANY (TRAVIS PEAK 6300)
Permits
1
Max Depth
6,511 ft
First Permit
1982-11-17
Latest Activity
1982-11-17
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1983-06-01
Shut-In
—
Plugged
2022-08-10
!
EWA / Permit operator mismatch
Scheduling: PHILLIPS JACK L. CO. ≠ Permit: PHILLIPS, JACK L.
Resolved via: scheduling → PHILLIPS JACK L. CO.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-03
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#177609 A PHILLIPS, JACK L.
received 1982-11-17
Well Details
- Well Number
- 2
- Max Depth
- 6,511 ft
- Drill Type
- Vertical
- County
- HARRISON
- District
- 6
- Operator
- PHILLIPS JACK L. CO.
- Completed
- 1983-06-01
Operator
- Name
- PHILLIPS, JACK L. CO
- Location
- GLADEWATER
- P-5 Status
- Y (filed 2025-10-04)
- Cum Oil (all leases)
- 679,371 bbl
- Cum Gas (all leases)
- 11,288,122 mcf
- Activities
- GTHS/G, OPRS/G, OPRS/O
- Total Permits
- 32