42-203-31035

Final Completion

WOODLAWN /HILL/ UNIT

HARRISON County · District 6 · L & R PETROLEUM · WOODLAWN (HILL)

RRC Lookup

Permits

1

Max Depth

6,200 ft

First Permit

1983-02-22

Latest Activity

1983-02-22

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1983-05-13

Shut-In

Plugged

2003-05-19

!

EWA / Permit operator mismatch

Scheduling: L & R PETROLEUM ≠ Permit: 3C OPERATING COMPANY

Resolved via: schedulingL & R PETROLEUM

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2008-03

Operator History

originally filed by 3C OPERATING COMPANY — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#186617 A 3C OPERATING COMPANY
received 1983-02-22

Well Details

Well Number
2013
Max Depth
6,200 ft
Drill Type
Vertical
County
HARRISON
District
6
Completed
1983-05-13

Operator

Location
KILGORE
P-5 Status
Y (filed 2003-07-11)
Cum Oil (all leases)
22,637 bbl
Cum Gas (all leases)
298,593 mcf

External Links

Live © 2026 Petrora