42-203-31384

SHUT IN

WILLIAMS MOSE

HARRISON County · District 6 · BROOKSTON ENERGY INC. · WASKOM (SANDERS SAND)

RRC Lookup

Permits

1

Max Depth

6,500 ft

First Permit

1986-01-15

Latest Activity

1986-01-15

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

1986-12-03

Shut-In

Plugged

P-5 Org Status: Active

!

EWA / Production operator mismatch

Scheduling: BROOKSTON ENERGY INC. ≠ Production: HOPEWELL OPERATING, INC. (reported 1997-09)

!

EWA / Permit operator mismatch

Scheduling: BROOKSTON ENERGY INC. ≠ Permit: FIELDS, BERT, JR.

Resolved via: schedulingBROOKSTON ENERGY INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#295566 A FIELDS, BERT, JR.
received 1986-01-16

Well Details

Well Number
1
Max Depth
6,500 ft
Drill Type
Vertical
County
HARRISON
District
6
Completed
1986-12-03

Operator

Location
TYLER
P-5 Status
Y (filed 2025-06-04)
Cum Oil (all leases)
498,418 bbl
Cum Gas (all leases)
26,618,722 mcf
Activities
CSGD/G, CSGD/P, G/PUR, GTHS/G, OPRS/G, OPRS/O
Total Permits
27

External Links

Live © 2026 Petrora