42-203-31412

Final Completion

JONESVILLE A

HARRISON County · District 6 · EXCO PRODUCTION COMPANY LP · WASKOM (TRAVIS PEAK 5)

RRC Lookup

Permits

1

Max Depth

6,700 ft

First Permit

1986-02-21

Latest Activity

1986-02-21

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1986-04-07

Shut-In

Plugged

2008-08-23

!

EWA / Production operator mismatch

Scheduling: EXCO PRODUCTION COMPANY LP ≠ Production: WINCHESTER PRODUCTION COMPANY (reported 2004-01)

!

EWA / Permit operator mismatch

Scheduling: EXCO PRODUCTION COMPANY LP ≠ Permit: WINCHESTER PRODUCTION COMPANY

Resolved via: schedulingEXCO PRODUCTION COMPANY LP

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2008-08

Operator History

originally filed by WINCHESTER PRODUCTION COMPANY — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#298220 A WINCHESTER PRODUCTION COMPANY
received 1986-02-13

Well Details

Well Number
19
Max Depth
6,700 ft
Drill Type
Vertical
County
HARRISON
District
6
Completed
1986-04-07

Operator

Location
DALLAS
P-5 Status
Y (filed 2009-12-04)
Cum Oil (all leases)
103,671 bbl
Cum Gas (all leases)
8,088,754 mcf
Total Permits
4

External Links

Live © 2026 Petrora