42-203-31428

Final Completion

ALLDAY

HARRISON County · District 6 · BROOKSTON ENERGY INC. · WASKOM (HURLEY ORR)

RRC Lookup

Permits

1

Max Depth

5,100 ft

First Permit

1986-03-18

Latest Activity

1986-03-18

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1986-05-08

Shut-In

Plugged

2023-06-08

!

EWA / Permit operator mismatch

Scheduling: BROOKSTON ENERGY INC. ≠ Permit: SHELBY, MICHAEL H.

Resolved via: schedulingBROOKSTON ENERGY INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2023-07

Operator History

originally filed by SHELBY, MICHAEL H. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#299794 A SHELBY, MICHAEL H.
received 1986-03-11

Well Details

Well Number
5
Max Depth
5,100 ft
Drill Type
Vertical
County
HARRISON
District
6
Completed
1986-05-08

Operator

Location
TYLER
P-5 Status
Y (filed 2025-06-04)
Cum Oil (all leases)
498,418 bbl
Cum Gas (all leases)
26,618,722 mcf
Activities
CSGD/G, CSGD/P, G/PUR, GTHS/G, OPRS/G, OPRS/O
Total Permits
27

External Links

Live © 2026 Petrora