42-203-31582

Final Completion

ABNEY R.K.

HARRISON County · District 6 · WINCHESTER PRODUCTION COMPANY · WASKOM (TRAVIS PEAK 5)

RRC Lookup

Permits

2

Max Depth

6,300 ft

First Permit

1987-03-03

Latest Activity

2003-11-25

Lifespan

17 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1987-07-15

Shut-In

Plugged

!

EWA / Production operator mismatch

Scheduling: WINCHESTER PRODUCTION COMPANY ≠ Production: BROOKSTON ENERGY, INC. (reported 2025-12)

Resolved via: productionBROOKSTON ENERGY, INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#538959 A WINCHESTER PRODUCTION COMPANY
received 2003-11-24
#326971 A RBD-SHELBY AGENCY
received 1987-02-23

Well Details

Well Number
8
Max Depth
6,300 ft
Drill Type
Vertical
County
HARRISON
District
6
Completed
1987-07-15

Operator

Location
SHREVEPORT
P-5 Status
Y (filed 2007-02-02)
Cum Oil (all leases)
1,603,255 bbl
Cum Gas (all leases)
105,563,647 mcf
Total Permits
528

External Links

Live © 2026 Petrora