42-203-31587

Final Completion

EDMONDSON LEE

HARRISON County · District 6 · EP OPERATING COMPANY · WHELAN (TRAVIS PEAK PRORATED)

RRC Lookup

Permits

1

Max Depth

9,000 ft

First Permit

1987-04-13

Latest Activity

1987-04-13

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1987-06-23

Shut-In

Plugged

2023-06-06

!

EWA / Production operator mismatch

Scheduling: EP OPERATING COMPANY ≠ Production: XTO ENERGY INC. (reported 2021-01)

Resolved via: schedulingEP OPERATING COMPANY

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#327672 A EP OPERATING COMPANY
received 1987-03-12

Well Details

Well Number
4
Max Depth
9,000 ft
Drill Type
Vertical
County
HARRISON
District
6
Completed
1987-06-23

Operator

Location
DALLAS
P-5 Status
Y (filed 1993-01-05)
Total Permits
568

External Links

Live © 2026 Petrora