42-203-31671

Final Completion

STEELE

HARRISON County · District 6 · EXCO PRODUCTION COMPANY LP · WASKOM (TRAVIS PEAK 6150)

RRC Lookup

Permits

3

Max Depth

6,700 ft

First Permit

1987-11-06

Latest Activity

1999-12-03

Lifespan

12 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1999-10-26

Shut-In

Plugged

2008-10-29

!

EWA / Production operator mismatch

Scheduling: EXCO PRODUCTION COMPANY LP ≠ Production: WINCHESTER PRODUCTION COMPANY (reported 2000-11)

!

EWA / Permit operator mismatch

Scheduling: EXCO PRODUCTION COMPANY LP ≠ Permit: WINCHESTER PRODUCTION COMPANY

Resolved via: schedulingEXCO PRODUCTION COMPANY LP

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2008-10

Operator History

originally filed by WINCHESTER PRODUCTION COMPANY — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (3)

#489880 A WINCHESTER PRODUCTION COMPANY
received 1999-11-29
#395095 A WINCHESTER PRODUCTION COMPANY
received 1991-12-16
#338348 A WINCHESTER PRODUCTION COMPANY
received 1987-11-04

Well Details

Well Number
3
Max Depth
6,700 ft
Drill Type
Vertical
County
HARRISON
District
6
Completed
1999-10-26

Operator

Location
DALLAS
P-5 Status
Y (filed 2009-12-04)
Cum Oil (all leases)
103,671 bbl
Cum Gas (all leases)
8,088,754 mcf
Total Permits
4

External Links

Live © 2026 Petrora