42-203-31716

PARTIAL PLUG

TAYLOR W.B.

HARRISON County · District 6 · SHERIDAN PRODUCTION CO III LLC · WASKOM (TRAVIS PEAK 1)

RRC Lookup

Permits

2

Max Depth

7,800 ft

First Permit

1988-07-29

Latest Activity

1999-06-15

Lifespan

11 yrs

Regulatory Status

Schedule

ON SCHEDULE

Completion

2003-06-08

Shut-In

Plugged

P-5 Org Status: Active

!

EWA / Permit operator mismatch

Scheduling: SHERIDAN PRODUCTION CO III LLC ≠ Permit: SEAGULL ENERGY E&P INC.

Resolved via: schedulingSHERIDAN PRODUCTION CO III LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#485171 A SEAGULL ENERGY E&P INC.
received 1999-06-14
#349571 A ARKLA, INC.
received 1988-07-29

Well Details

Well Number
7
Max Depth
7,800 ft
Drill Type
Vertical
County
HARRISON
District
6
Completed
2003-06-08

Operator

Location
HOUSTON
P-5 Status
Y (filed 2025-06-04)
Cum Oil (all leases)
456,482 bbl
Cum Gas (all leases)
172,697,741 mcf
Activities
CSGD/G, CSGD/P, G/PUR, GTHS/G, OPRS/G, OPRS/O
Total Permits
97

External Links

Live © 2026 Petrora