42-203-31735

Final Completion

SHELBURN

HARRISON County · District 6 · BROOKSTON ENERGY INC. · WASKOM (TRAVIS PEAK 6150)

RRC Lookup

Permits

3

Max Depth

6,700 ft

First Permit

1988-09-21

Latest Activity

2000-12-04

Lifespan

12 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2000-10-31

Shut-In

Plugged

2021-09-27

!

EWA / Production operator mismatch

Scheduling: BROOKSTON ENERGY INC. ≠ Production: EXCO/HGI JV ASSETS, LLC (reported 2013-09)

!

EWA / Permit operator mismatch

Scheduling: BROOKSTON ENERGY INC. ≠ Permit: WINCHESTER PRODUCTION COMPANY

Resolved via: schedulingBROOKSTON ENERGY INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2021-09

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (3)

#502479 A WINCHESTER PRODUCTION COMPANY
received 2000-11-30
#383175 A WINCHESTER PRODUCTION COMPANY
received 1991-01-08
#351471 A WINCHESTER PRODUCTION COMPANY
received 1988-09-21

Well Details

Well Number
2
Max Depth
6,700 ft
Drill Type
Vertical
County
HARRISON
District
6
Completed
2000-10-31

Operator

Location
TYLER
P-5 Status
Y (filed 2025-06-04)
Cum Oil (all leases)
498,418 bbl
Cum Gas (all leases)
26,618,722 mcf
Activities
CSGD/G, CSGD/P, G/PUR, GTHS/G, OPRS/G, OPRS/O
Total Permits
27

External Links

Live © 2026 Petrora