42-203-32358

Final Completion

SCOTT T.P.

HARRISON County · District 6 · DEVON ENERGY PRODUCTION CO L.P. · WASKOM (COTTON VALLEY)

RRC Lookup

Permits

1

Max Depth

9,625 ft

First Permit

1996-02-07

Latest Activity

1996-02-07

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1996-05-01

Shut-In

Plugged

2007-04-12

!

EWA / Production operator mismatch

Scheduling: DEVON ENERGY PRODUCTION CO L.P. ≠ Production: OCEAN ENERGY, INC. (reported 2001-06)

!

EWA / Permit operator mismatch

Scheduling: DEVON ENERGY PRODUCTION CO L.P. ≠ Permit: SEAGULL MID-SOUTH, INC.

Resolved via: schedulingDEVON ENERGY PRODUCTION CO L.P.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1996-05

Last Production

2007-07

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#444549 A SEAGULL MID-SOUTH, INC.
received 1996-02-07

Well Details

Well Number
12
Max Depth
9,625 ft
Drill Type
Vertical
County
HARRISON
District
6
Completed
1996-05-01

Operator

Location
OKLAHOMA CI, TY
P-5 Status
Y (filed 2025-11-04)
Cum Oil (all leases)
360,504,673 bbl
Cum Gas (all leases)
9,266,199,431 mcf
Activities
CSGD/G, CSGD/P, G/PUR, GTHS/C, GTHS/G, GTHS/O, OPRS/G, OPRS/O
Total Permits
9,223

External Links

Live © 2026 Petrora