42-203-32416
PRODUCINGDAVIS JIM
HARRISON County · District 6 · SHERIDAN PRODUCTION CO III LLC · WASKOM (TRAVIS PEAK 6115)
Permits
3
Max Depth
9,650 ft
First Permit
1997-01-28
Latest Activity
2000-02-11
Lifespan
3 yrs
Regulatory Status
Schedule
ON SCHEDULE
Completion
2000-07-11
Shut-In
—
Plugged
—
P-5 Org Status: Active
EWA / Production operator mismatch
Scheduling: SHERIDAN PRODUCTION CO III LLC ≠ Production: DEVON ENERGY PRODUCTION CO, L.P. (reported 2011-08)
EWA / Permit operator mismatch
Scheduling: SHERIDAN PRODUCTION CO III LLC ≠ Permit: SEAGULL ENERGY E&P INC.
Resolved via: scheduling → SHERIDAN PRODUCTION CO III LLC
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1997-04
Last Production
2026-03
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (3)
Permit Applications (3)
Well Details
- Well Number
- 9U
- Max Depth
- 9,650 ft
- Drill Type
- Vertical
- County
- HARRISON
- District
- 6
- Operator
- SHERIDAN PRODUCTION CO III LLC
- Completed
- 2000-07-11
Operator
- Location
- HOUSTON
- P-5 Status
- Y (filed 2025-06-04)
- Cum Oil (all leases)
- 456,482 bbl
- Cum Gas (all leases)
- 172,697,741 mcf
- Activities
- CSGD/G, CSGD/P, G/PUR, GTHS/G, OPRS/G, OPRS/O
- Total Permits
- 97