42-203-32529

Final Completion

TAYLOR W. B. A

HARRISON County · District 6 · SEAGULL ENERGY E&P INC. · WASKOM (TRAVIS PEAK 6150)

RRC Lookup

Permits

2

Max Depth

7,850 ft

First Permit

1998-07-31

Latest Activity

1999-10-05

Lifespan

1 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1998-10-17

Shut-In

Plugged

2024-09-19

!

EWA / Production operator mismatch

Scheduling: SEAGULL ENERGY E&P INC. ≠ Production: DEVON ENERGY PRODUCTION CO, L.P. (reported 2007-04)

Resolved via: schedulingSEAGULL ENERGY E&P INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1998-10

Last Production

2024-09

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#488158 A SEAGULL ENERGY E&P INC.
received 1999-10-04
#478366 A SEAGULL ENERGY E&P INC.
received 1998-07-30

Well Details

Well Number
7
Max Depth
7,850 ft
Drill Type
Vertical
County
HARRISON
District
6
Completed
1998-10-17

Operator

Location
HOUSTON
P-5 Status
Y (filed 2016-02-05)
Cum Oil (all leases)
568,707 bbl
Cum Gas (all leases)
130,017,827 mcf
Total Permits
172

External Links

Live © 2026 Petrora