42-203-32610

PRODUCING

HUGHES DELLA

HARRISON County · District 6 · FAULCONER ENERGY LLC · WHELAN (TRAVIS PEAK PRORATED)

RRC Lookup

Permits

1

Max Depth

9,400 ft

First Permit

2000-04-19

Latest Activity

2000-04-19

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

2001-09-21

Shut-In

Plugged

P-5 Org Status: Active

!

EWA / Production operator mismatch

Scheduling: FAULCONER ENERGY LLC ≠ Production: XTO ENERGY INC. (reported 2017-04)

!

EWA / Permit operator mismatch

Scheduling: FAULCONER ENERGY LLC ≠ Permit: CROSS TIMBERS OPERATING COMPANY

Resolved via: schedulingFAULCONER ENERGY LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2000-08

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#493881 A CROSS TIMBERS OPERATING COMPANY
received 2000-04-07

Well Details

Well Number
13
Max Depth
9,400 ft
Drill Type
Vertical
County
HARRISON
District
6
Completed
2001-09-21

Operator

Location
TYLER
P-5 Status
Y (filed 2025-09-04)
Cum Oil (all leases)
344,817 bbl
Cum Gas (all leases)
64,700,023 mcf
Activities
CSGD/G, CSGD/P, G/PUR, GTHS/G, OPRS/G, OPRS/O
Total Permits
37

External Links

Live © 2026 Petrora