42-203-32622
Final CompletionTECARO WOOD
HARRISON County · District 6 · FAULCONER ENERGY LLC · LANSING NORTH (TRAVIS PEAK)
Permits
2
Max Depth
11,000 ft
First Permit
2000-07-07
Latest Activity
2002-03-07
Lifespan
2 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
2002-02-22
Shut-In
—
Plugged
2024-04-24
!
EWA / Production operator mismatch
Scheduling: FAULCONER ENERGY LLC ≠ Production: XTO ENERGY INC. (reported 2019-03)
!
EWA / Permit operator mismatch
Scheduling: FAULCONER ENERGY LLC ≠ Permit: XTO ENERGY INC.
Resolved via: scheduling → FAULCONER ENERGY LLC
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
2000-10
Last Production
2024-04
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (2)
Permit Applications (2)
#517999 A XTO ENERGY INC.
received 2002-03-01
#495972 A CROSS TIMBERS OPERATING COMPANY
received 2000-06-08
Well Details
- Well Number
- 3
- Max Depth
- 11,000 ft
- Drill Type
- Vertical
- County
- HARRISON
- District
- 6
- Operator
- FAULCONER ENERGY LLC
- Completed
- 2002-02-22
Operator
- Name
- FAULCONER ENGY, LLC
- Location
- TYLER
- P-5 Status
- Y (filed 2025-09-04)
- Cum Oil (all leases)
- 344,817 bbl
- Cum Gas (all leases)
- 64,700,023 mcf
- Activities
- CSGD/G, CSGD/P, G/PUR, GTHS/G, OPRS/G, OPRS/O
- Total Permits
- 37