42-203-32622

Final Completion

TECARO WOOD

HARRISON County · District 6 · FAULCONER ENERGY LLC · LANSING NORTH (TRAVIS PEAK)

RRC Lookup

Permits

2

Max Depth

11,000 ft

First Permit

2000-07-07

Latest Activity

2002-03-07

Lifespan

2 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2002-02-22

Shut-In

Plugged

2024-04-24

!

EWA / Production operator mismatch

Scheduling: FAULCONER ENERGY LLC ≠ Production: XTO ENERGY INC. (reported 2019-03)

!

EWA / Permit operator mismatch

Scheduling: FAULCONER ENERGY LLC ≠ Permit: XTO ENERGY INC.

Resolved via: schedulingFAULCONER ENERGY LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2000-10

Last Production

2024-04

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#517999 A XTO ENERGY INC.
received 2002-03-01
#495972 A CROSS TIMBERS OPERATING COMPANY
received 2000-06-08

Well Details

Well Number
3
Max Depth
11,000 ft
Drill Type
Vertical
County
HARRISON
District
6
Completed
2002-02-22

Operator

Location
TYLER
P-5 Status
Y (filed 2025-09-04)
Cum Oil (all leases)
344,817 bbl
Cum Gas (all leases)
64,700,023 mcf
Activities
CSGD/G, CSGD/P, G/PUR, GTHS/G, OPRS/G, OPRS/O
Total Permits
37

External Links

Live © 2026 Petrora