42-203-32767

PRODUCING

BLOCKER-KEY

HARRISON County · District 6 · SMITH RESOURCES L.L.C. · BETHANY (TRAVIS PEAK CONS.)

RRC Lookup

Permits

2

Max Depth

7,100 ft

First Permit

2002-11-20

Latest Activity

2002-11-20

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

2003-08-14

Shut-In

Plugged

P-5 Org Status: X

!

EWA / Permit operator mismatch

Scheduling: SMITH RESOURCES L.L.C. ≠ Permit: SMITH, E.N. III ENERGY CORP.

Resolved via: productionSMITH RESOURCES, L.L.C.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2003-08

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#525699 A SMITH, E.N. III ENERGY CORP.
received 2003-08-21
#525699 A SMITH, E.N. III ENERGY CORP.
received 2002-11-20

Well Details

Well Number
1
Max Depth
7,100 ft
Drill Type
Vertical
County
HARRISON
District
6
Completed
2003-08-14

Operator

Location
MARSHALL
P-5 Status
Y (filed 2025-09-04)
Cum Oil (all leases)
33,614 bbl
Cum Gas (all leases)
255,996 mcf
Activities
OPRS/G, OPRS/O

External Links

Live © 2026 Petrora