42-203-33877
PRODUCINGHOGAN
HARRISON County · District 6 · SABINE ENERGY INC. · WOODLAWN SW. (COTTON VALLEY)
Permits
2
Max Depth
11,500 ft
First Permit
2007-04-05
Latest Activity
2007-04-05
Lifespan
< 1 yr
Regulatory Status
Schedule
ON SCHEDULE
Completion
2014-04-11
Shut-In
—
Plugged
—
P-5 Org Status: Active
!
EWA / Production operator mismatch
Scheduling: SABINE ENERGY INC. ≠ Production: SABINE OIL & GAS CORPORATION (reported 2025-12)
!
EWA / Permit operator mismatch
Scheduling: SABINE ENERGY INC. ≠ Permit: O'BENCO, INC.
Resolved via: production → SABINE OIL & GAS CORPORATION
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
2007-06
Last Production
2026-03
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (2)
Permit Applications (2)
#635447 A O'BENCO, INC.
received 2007-04-17
#635447 A O'BENCO, INC.
received 2007-03-16
Well Details
- Well Number
- 2
- Max Depth
- 11,500 ft
- Drill Type
- Vertical
- County
- HARRISON
- District
- 6
- Operator
- SABINE ENERGY INC.
- Completed
- 2014-04-11
Operator
- Name
- SABINE ENGY INC
- Location
- HOUSTON
- P-5 Status
- Y (filed 2026-02-06)
- Cum Oil (all leases)
- — bbl
- Cum Gas (all leases)
- — mcf
- Activities
- OPRS/G, OPRS/O
- Total Permits
- 25