42-203-34231

Final Completion

BYRNE HAZEL GAS UNIT NO. 2

HARRISON County · District 6 · BERRY OIL COMP. · CARTHAGE NORTH (BOSSIER SHALE)

RRC Lookup

Permits

3

Max Depth

12,000 ft

First Permit

2007-12-19

Latest Activity

2009-01-29

Lifespan

1 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2008-06-09

Shut-In

Plugged

!

EWA / Production operator mismatch

Scheduling: BERRY OIL COMP. ≠ Production: BERRY PETROLEUM COMPANY, LLC (reported 2018-05)

Resolved via: schedulingBERRY OIL COMP.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2008-06

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Well Details

Well Number
8
Max Depth
12,000 ft
Drill Type
Vertical
County
HARRISON
District
6
Completed
2008-06-09

Operator

Location
HOUSTON
P-5 Status
Y (filed 2016-03-04)
Cum Oil (all leases)
5,069,121 bbl
Cum Gas (all leases)
60,539,745 mcf
Total Permits
831

External Links

Live © 2026 Petrora