42-207-31906
Final CompletionROSE
HASKELL County · District 7 · ANVIL OPERATING INC. · TEXAS ROSE (CANYON REEF)
Permits
1
Max Depth
2,990 ft
First Permit
1987-10-23
Latest Activity
1987-10-23
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1987-12-08
Shut-In
—
Plugged
1990-12-06
!
EWA / Permit operator mismatch
Scheduling: ANVIL OPERATING INC. ≠ Permit: ANVIL PETROLEUM, INC. (TLT)
Resolved via: scheduling → ANVIL OPERATING INC.
Operator History
originally filed by ANVIL PETROLEUM, INC. (TLT) — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#337806 A ANVIL PETROLEUM, INC. (TLT)
received 1987-10-22
Well Details
- Well Number
- 2A
- Max Depth
- 2,990 ft
- Drill Type
- Vertical
- County
- HASKELL
- District
- 7
- Operator
- ANVIL OPERATING INC.
- Completed
- 1987-12-08
Operator
- Name
- ANVIL OPER, INC
- Location
- ABILENE
- P-5 Status
- Y (filed 1992-10-27)
- Total Permits
- 2