42-211-31628
Final CompletionHODGES
HEMPHILL County · District 10 · PERMIAN WEST PIPE INC. · BUFFALO WALLOW (OSWEGO UPPER)
Permits
1
Max Depth
11,550 ft
First Permit
1983-09-27
Latest Activity
1983-09-27
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1984-06-15
Shut-In
—
Plugged
1990-04-24
!
EWA / Permit operator mismatch
Scheduling: PERMIAN WEST PIPE INC. ≠ Permit: TENNECO OIL CO.
Resolved via: scheduling → PERMIAN WEST PIPE INC.
Operator History
originally filed by TENNECO OIL CO. — asset transferred
Permit History (1)
Permit Applications (4)
#214723 A TENNECO OIL CO.
received 1984-12-27
#214723 A TENNECO OIL CO.
received 1984-07-18
#214723 A TENNECO OIL CO.
received 1984-03-30
#214723 A TENNECO OIL CO.
received 1983-09-21
Well Details
- Well Number
- 1018
- Max Depth
- 11,550 ft
- Drill Type
- Vertical
- County
- HEMPHILL
- District
- 10
- Operator
- PERMIAN WEST PIPE INC.
- Completed
- 1984-06-15
Operator
- Location
- ODESSA
- P-5 Status
- Y (filed 1993-09-09)
- Cum Oil (all leases)
- — bbl
- Cum Gas (all leases)
- — mcf