Permits
1
Max Depth
12,800 ft
First Permit
1995-09-14
Latest Activity
1995-09-14
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1996-01-01
Shut-In
—
Plugged
2024-10-21
!
EWA / Permit operator mismatch
Scheduling: PABLO ENERGY II LLC ≠ Permit: PABLO ENERGY, INC.
Resolved via: scheduling → PABLO ENERGY II LLC
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1996-01
Last Production
2024-10
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#439732 A PABLO ENERGY, INC.
received 1995-09-08
Well Details
- Well Number
- 1032
- Max Depth
- 12,800 ft
- Drill Type
- Vertical
- County
- HEMPHILL
- District
- 10
- Operator
- PABLO ENERGY II LLC
- Completed
- 1996-01-01
Operator
- Name
- PABLO ENERGY II, LLC
- Location
- AMARILLO
- P-5 Status
- Y (filed 2025-10-04)
- Cum Oil (all leases)
- 185,326 bbl
- Cum Gas (all leases)
- 1,539,867 mcf