42-213-30657
Plug Dry Hole (P&A)WALLACE HEIRS
HENDERSON County · District 6 · WILDCAT
Permits
1
Max Depth
11,000 ft
First Permit
1990-01-31
Latest Activity
1990-01-31
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
—
Shut-In
—
Plugged
1990-07-03
!
EWA / Permit operator mismatch
Scheduling: PALMER PETROLEUM INC. ≠ Permit: PALMER PETROLEUM INC.
Resolved via: scheduling → PALMER PETROLEUM INC.
Operator History
originally filed by PALMER PETROLEUM INC. — asset transferred
Permit History (1)
Permit Applications (1)
#369252 A PALMER PETROLEUM INC.
received 1990-01-30
Well Details
- Well Number
- 1
- Max Depth
- 11,000 ft
- Drill Type
- Vertical
- County
- HENDERSON
- District
- 6
- Operator
- —