42-213-31109

INJECTION Horizontal

TRI-CITIES GAS STORAGE UNIT

HENDERSON County · District 5 · ATMOS PIPELINE - TEXAS · TRI-CITIES (RODESSA)

RRC Lookup

Permits

1

Max Depth

8,000 ft

First Permit

2018-12-31

Latest Activity

2018-12-31

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

2019-05-17

Shut-In

Plugged

P-5 Org Status: Active

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2021-02

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#846505 A ATMOS PIPELINE - TEXAS
received 2018-11-05
Lat 32.125395
Lon -95.941581

Well Details

Well Number
24RH
Max Depth
8,000 ft
Drill Type
Horizontal
County
HENDERSON
District
5
Completed
2019-05-17

Operator

Location
DALLAS
P-5 Status
Y (filed 2025-06-04)
Cum Oil (all leases)
— bbl
Cum Gas (all leases)
132,125 mcf
Activities
CSGD/G, G/PUR, GTHS/G, OPRS/G, OPRS/O
Total Permits
90

External Links

Live © 2026 Petrora