42-215-00703
Final CompletionCHANDLER-TAYLOR UNIT
HIDALGO County · District 4 · TENNECO OIL CO. · MONTE CHRISTO NORTH (F-17)
Permits
2
Max Depth
9,750 ft
First Permit
1998-07-24
Latest Activity
1998-07-24
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
—
Shut-In
—
Plugged
1981-03-06
!
EWA / Permit operator mismatch
Scheduling: TENNECO OIL CO. ≠ Permit: HILCORP ENERGY COMPANY
Resolved via: scheduling → TENNECO OIL CO.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1999-09
Last Production
2012-09
Operator History
originally filed by HILCORP ENERGY COMPANY — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (2)
Permit Applications (2)
#478131 A HILCORP ENERGY COMPANY
received 1999-05-12
#478131 A HOUSTON RESOURCES CORP.
received 1998-07-20
Well Details
- Well Number
- 1
- Max Depth
- 9,750 ft
- Drill Type
- Vertical
- County
- HIDALGO
- District
- 4
- Operator
- TENNECO OIL CO.
Operator
- Name
- TENNECO OIL CO
- Location
- HOUSTON
- P-5 Status
- Y (filed 2016-02-05)
- Cum Oil (all leases)
- — bbl
- Cum Gas (all leases)
- — mcf
- Total Permits
- 863