42-215-01128

Final Completion

SCHWARZ

HIDALGO County · District 4 · FAULCONER VERNON E. INC. · LACY (J-2)

RRC Lookup

Permits

2

Max Depth

7,625 ft

First Permit

1979-05-23

Latest Activity

1990-05-07

Lifespan

11 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1979-09-15

Shut-In

Plugged

2013-10-23

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2014-04

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#367559 A FAULCONER, VERNON E., INC.
received 1989-12-12
#49111 A ANDOVER OIL COMPANY
received 1979-05-23

Well Details

Well Number
1
Max Depth
7,625 ft
Drill Type
Vertical
County
HIDALGO
District
4
Completed
1979-09-15

Operator

Location
TYLER
P-5 Status
Y (filed 2025-12-04)
Cum Oil (all leases)
262,020 bbl
Cum Gas (all leases)
212,479,495 mcf
Activities
CSGD/P, G/PUR, GTHS/G
Total Permits
16

External Links

Live © 2026 Petrora