42-215-01493

Final Completion Directional

MCALLEN FIELDWIDE UNIT

HIDALGO County · District 4 · TENNECO OIL CO. · MCALLEN (HACKNEY LAKE NORTH)

RRC Lookup

Permits

2

Max Depth

8,450 ft

First Permit

1987-05-26

Latest Activity

1990-11-12

Lifespan

3 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

Shut-In

Plugged

!

EWA / Production operator mismatch

Scheduling: TENNECO OIL CO. ≠ Production: FINA OIL & CHEMICAL COMPANY (reported 1996-11)

!

EWA / Permit operator mismatch

Scheduling: TENNECO OIL CO. ≠ Permit: FINA OIL & CHEMICAL COMPANY

Resolved via: schedulingTENNECO OIL CO.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Operator History

originally filed by FINA OIL & CHEMICAL COMPANY — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#380685 A FINA OIL & CHEMICAL COMPANY
received 1990-11-06
#330000 A TENNECO OIL CO.
received 1987-05-08

Well Details

Well Number
20
Max Depth
8,450 ft
Drill Type
Directional
County
HIDALGO
District
4

Operator

Location
HOUSTON
P-5 Status
Y (filed 2016-02-05)
Cum Oil (all leases)
— bbl
Cum Gas (all leases)
— mcf
Total Permits
863

External Links

Live © 2026 Petrora