42-215-31416
Final CompletionNO. 3 HAMMAN B GAS UNIT
HIDALGO County · District 4 · FAULCONER VERNON E. INC. · MONTE CHRISTO (VX-ECKART-EE CNS)
Permits
2
Max Depth
13,500 ft
First Permit
1983-12-02
Latest Activity
1984-06-12
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1984-05-20
Shut-In
—
Plugged
2014-06-13
!
EWA / Permit operator mismatch
Scheduling: FAULCONER VERNON E. INC. ≠ Permit: BRIGHT & CO.
Resolved via: scheduling → FAULCONER VERNON E. INC.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2014-06
Operator History
originally filed by BRIGHT & CO. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (2)
Permit Applications (3)
#242204 A BRIGHT & CO.
received 1984-05-14
#222212 A BRIGHT & CO.
received 1984-01-24
#222212 A BRIGHT & CO.
received 1983-11-28
Well Details
- Well Number
- 3
- Max Depth
- 13,500 ft
- Drill Type
- Vertical
- County
- HIDALGO
- District
- 4
- Operator
- FAULCONER VERNON E. INC.
- Completed
- 1984-05-20
Operator
- Location
- TYLER
- P-5 Status
- Y (filed 2025-12-04)
- Cum Oil (all leases)
- 262,020 bbl
- Cum Gas (all leases)
- 212,479,495 mcf
- Activities
- CSGD/P, G/PUR, GTHS/G
- Total Permits
- 16