42-215-31431
Final CompletionBALDRIDGE E.I.A.
HIDALGO County · District 4 · BNP PETROLEUM CORPORATION · TABASCO NORTH (R)
Permits
1
Max Depth
10,600 ft
First Permit
1984-01-03
Latest Activity
1984-01-03
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1984-05-30
Shut-In
—
Plugged
2000-11-02
EWA / Production operator mismatch
Scheduling: BNP PETROLEUM CORPORATION ≠ Production: WINCHESTER ENERGY OPERATING CO. (reported 1998-06)
EWA / Permit operator mismatch
Scheduling: BNP PETROLEUM CORPORATION ≠ Permit: WINCHESTER ENERGY COMPANY
Resolved via: scheduling → BNP PETROLEUM CORPORATION
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2001-07
Operator History
originally filed by WINCHESTER ENERGY COMPANY — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (2)
Well Details
- Well Number
- 1
- Max Depth
- 10,600 ft
- Drill Type
- Vertical
- County
- HIDALGO
- District
- 4
- Operator
- BNP PETROLEUM CORPORATION
- Completed
- 1984-05-30
Operator
- Name
- BNP PETRO CORP
- Location
- CORPUS CHRS, TI
- P-5 Status
- Y (filed 2026-01-04)
- Cum Oil (all leases)
- 81,286 bbl
- Cum Gas (all leases)
- 41,517,240 mcf
- Activities
- OPRS/G
- Total Permits
- 132