42-215-31485

TEMP ABANDONED

HAMMAN A

HIDALGO County · District 4 · FAULCONER ENERGY LLC · MONTE CHRISTO (FRIO CONS.)

RRC Lookup

Permits

3

Max Depth

11,500 ft

First Permit

1984-05-18

Latest Activity

2001-07-27

Lifespan

17 yrs

Regulatory Status

Schedule

ON SCHEDULE

Completion

2001-08-17

Shut-In

Plugged

P-5 Org Status: Active

!

EWA / Production operator mismatch

Scheduling: FAULCONER ENERGY LLC ≠ Production: FAULCONER, VERNON E., INC. (reported 2021-10)

!

EWA / Permit operator mismatch

Scheduling: FAULCONER ENERGY LLC ≠ Permit: BRIGHT & CO.

Resolved via: schedulingFAULCONER ENERGY LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (4)

#511963 A BRIGHT & CO.
received 2001-07-27
#329223 A BRIGHT & CO.
received 1987-04-20
#239285 A BRIGHT & CO.
received 1984-10-02
#239285 A BRIGHT & CO.
received 1984-05-16

Well Details

Well Number
10
Max Depth
11,500 ft
Drill Type
Vertical
County
HIDALGO
District
4
Completed
2001-08-17

Operator

Location
TYLER
P-5 Status
Y (filed 2025-09-04)
Cum Oil (all leases)
344,817 bbl
Cum Gas (all leases)
64,700,023 mcf
Activities
CSGD/G, CSGD/P, G/PUR, GTHS/G, OPRS/G, OPRS/O
Total Permits
37

External Links

Live © 2026 Petrora