42-215-31547
Final CompletionFOUR S MINERALS
HIDALGO County · District 4 · FAULCONER ENERGY LLC · OBLATE (FRIO 10200 SD)
Permits
1
Max Depth
18,000 ft
First Permit
1984-10-11
Latest Activity
1984-10-11
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1985-01-31
Shut-In
—
Plugged
2023-04-25
!
EWA / Production operator mismatch
Scheduling: FAULCONER ENERGY LLC ≠ Production: FAULCONER, VERNON E., INC. (reported 2019-06)
!
EWA / Permit operator mismatch
Scheduling: FAULCONER ENERGY LLC ≠ Permit: WILLIAMS, CLAYTON W., JR.
Resolved via: scheduling → FAULCONER ENERGY LLC
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2023-04
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (2)
#254135 A WILLIAMS, CLAYTON W., JR.
received 1985-01-15
#254135 A WILLIAMS, CLAYTON W., JR.
received 1984-10-11
Well Details
- Well Number
- 1
- Max Depth
- 18,000 ft
- Drill Type
- Vertical
- County
- HIDALGO
- District
- 4
- Operator
- FAULCONER ENERGY LLC
- Completed
- 1985-01-31
Operator
- Name
- FAULCONER ENGY, LLC
- Location
- TYLER
- P-5 Status
- Y (filed 2025-09-04)
- Cum Oil (all leases)
- 344,817 bbl
- Cum Gas (all leases)
- 64,700,023 mcf
- Activities
- CSGD/G, CSGD/P, G/PUR, GTHS/G, OPRS/G, OPRS/O
- Total Permits
- 37