42-215-31547

Final Completion

FOUR S MINERALS

HIDALGO County · District 4 · FAULCONER ENERGY LLC · OBLATE (FRIO 10200 SD)

RRC Lookup

Permits

1

Max Depth

18,000 ft

First Permit

1984-10-11

Latest Activity

1984-10-11

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1985-01-31

Shut-In

Plugged

2023-04-25

!

EWA / Production operator mismatch

Scheduling: FAULCONER ENERGY LLC ≠ Production: FAULCONER, VERNON E., INC. (reported 2019-06)

!

EWA / Permit operator mismatch

Scheduling: FAULCONER ENERGY LLC ≠ Permit: WILLIAMS, CLAYTON W., JR.

Resolved via: schedulingFAULCONER ENERGY LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2023-04

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#254135 A WILLIAMS, CLAYTON W., JR.
received 1985-01-15
#254135 A WILLIAMS, CLAYTON W., JR.
received 1984-10-11

Well Details

Well Number
1
Max Depth
18,000 ft
Drill Type
Vertical
County
HIDALGO
District
4
Completed
1985-01-31

Operator

Location
TYLER
P-5 Status
Y (filed 2025-09-04)
Cum Oil (all leases)
344,817 bbl
Cum Gas (all leases)
64,700,023 mcf
Activities
CSGD/G, CSGD/P, G/PUR, GTHS/G, OPRS/G, OPRS/O
Total Permits
37

External Links

Live © 2026 Petrora