42-215-31595

Final Completion

GARCIA J.A. ETAL

HIDALGO County · District 4 · MUELLER ENGINEERING CORP. · BLOOMBERG (VICKSBURG 6800)

RRC Lookup

Permits

1

Max Depth

11,000 ft

First Permit

1985-04-02

Latest Activity

1985-04-02

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1985-08-07

Shut-In

Plugged

1992-11-25

!

EWA / Permit operator mismatch

Scheduling: MUELLER ENGINEERING CORP. ≠ Permit: HAMILTON BROTHERS OIL CO.

Resolved via: schedulingMUELLER ENGINEERING CORP.

Operator History

originally filed by HAMILTON BROTHERS OIL CO. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (3)

#271207 A HAMILTON BROTHERS OIL CO.
received 1985-05-30
#271207 A HAMILTON BROTHERS OIL CO.
received 1985-05-01
#271207 A HAMILTON BROTHERS OIL CO.
received 1985-03-27

Well Details

Well Number
3
Max Depth
11,000 ft
Drill Type
Vertical
County
HIDALGO
District
4
Completed
1985-08-07

Operator

Location
CORPUS CHRS, TI
P-5 Status
Y (filed 2001-05-11)
Cum Oil (all leases)
460,209 bbl
Cum Gas (all leases)
8,158,494 mcf
Total Permits
236

External Links

Live © 2026 Petrora